Engineering the second floor - properly.
Structural Engineering.
In-house structural calculations, load-test certification and venue-specific sign-off documentation.
Mezzanine Hospitality.
Bars, lounges, kitchens and AV - engineered as finished interiors, not as scaffolding decorated to look like one.
Private Meeting Rooms.
Acoustically isolated upstairs rooms for confidential briefings, contract signing and press time.
Glass & Open Stairs.
Open feature staircases, glazed balustrades and sightlines that keep the ground-floor brand visible from across the hall.
AV & Power.
Full electrical distribution to both floors, fibre risers, and venue-grade fire and emergency systems.
Venue Approvals.
Drawings, calcs and sign-off pack delivered to venue technical services on your behalf.
Brief to build day.
Feasibility
WEEK 0 - 1
Venue rules, ceiling clearance and structural envelope check.
Concept
WEEK 1 - 3
Two-storey zoning, ground-floor brand, upstairs hospitality.
Calculate
WEEK 3 - 6
Structural calcs, load tests, venue submission pack.
Fabricate
WEEK 6 - 13
Pre-build the deck, finish the rooms, pack as flat-pack assemblies.
Erect
SHOW WEEK
Two-shift install, structural inspection, signed venue handover.
Strike
SHOW DAYS
Reverse-logistics dismantle, deck stored as numbered modules.