VOL. XII · ISSUE 04 · DESIGN, LEAD
Most teams approve a transatlantic show program the same way. They take the booth that worked in one city, ask for the same thing in the other, and expect similar cost and effort.
It never works out that way.
Our earlier piece, Drayage, and the Atlantic gap, explained why moving a 20×20 in Las Vegas costs more than moving the same booth in Frankfurt. But drayage is one line on the invoice. The gap also shows up in design, approvals, labour, schedule, and what visitors expect.
This blog covers those differences for the people who sign off on the budget. It reflects what we see building on both sides of the Atlantic. Rules and deadlines change by show and by year, so use this to know what to ask, and always confirm against the organiser’s exhibitor manual.
The short version
A 20×20 is 400 square feet, about 37 square metres. The conversion is easy. The way the space is used is not.
In the US, exhibitors typically bring a complete stand to an inline or island booth. At many European shows, larger exhibitors build on raw floor space, often with meeting rooms, storage, and hospitality built in.
So the first question to your builder changes. In the US it is “what do we do with this footprint?” In Europe it is “what do we need to build, and what does the organiser already provide?”
Our pages on custom exhibition stands and modular exhibition stands explain the options. The right choice can differ between the two cities, even for the same company.
Every venue has technical rules, and they differ in ways that change the design itself.
The costly mistake is finishing the design first and checking venue rules last. A late redesign costs far more than a design built for the venue from day one.
The drayage blog covers this for freight. It applies to the build too.
At many large US venues, labour jurisdiction rules decide who can unload, move, install, and dismantle. You often cannot bring your own crew into the hall. At many European venues there is more flexibility to use your own builder’s crew, within technical and safety rules.
In practice:
In either city, ask one direct question: “Who physically does each task on site, and who is accountable for it?” If the answer involves a chain of subcontractors, treat that as a risk.
You have two broad options.
Shipping the same stand both ways is often the most expensive path. Local production, or a modular system designed for reuse, usually works out better.
If you plan to reuse the stand, storage matters too. Our store and reuse service exists because many exhibitors pay to move or rebuild structures they could have kept. We also cover the environmental side in Beyond the bamboo.
Both markets reward early planning. They punish late planning in different ways.
These dates rarely line up across two shows, and a single combined schedule hides that.
Two guides cover the sequence: the 12-month trade show planning timeline and the booking timeline for US and European shows. If CES is on your list, read this note on booking CES 2027 soon.
This is a generalisation, so use it as a starting point. In our experience:
A booth built for foot traffic can feel wrong in a hall of scheduled meetings. A booth full of closed rooms can struggle where walk-up interest drives results.
Ask your sales team how business actually happens at each show, and brief your designer on that. Seeing the layout in 3D also helps you test visitor flow before anything is built. Our 3D visuals service covers renders, walk-throughs, and technical drawings.
A quick recap:
These are patterns, not guarantees. The exhibitor manual always overrides them.
A builder who answers specifically has done it before. One who answers in generalities probably has not.
Stop treating Las Vegas and Frankfurt as one line in the plan. Give each show its own brief, budget, and timeline. Reuse what transfers, such as brand system, graphics, and modular parts, and rebuild what does not.
Then decide which shows deserve the investment. Drayage, approvals, and build cost are all inputs to that decision, and they are far easier to weigh at the start of the year than on the invoice after the show.
If you are planning across both continents, our team works across worldwide exhibitions, and you can see past work in our portfolio. You can reach us through the contact page.
Three or four new essays per quarter on design, sustainability, logistics and the trade-show floor. No promos, no calendar spam.